NISCO hydropower steel is widely used in the construction of hydropower stations, and NISCO has achieved full coverage of the steel grade of hydropower steel. NISCO developed the Xinjiang regional hydropower project and successfully supplied XINJIANG JINGHE hydropower; With NISCO’s entry into the field of State Grid pumped storage power stations, it has successively won the bid for the FENGNING/JIXI/YIMENG pumped storage power station projects in China, and supplied the YIMENG project all the pressure steel pipe steel required. It has also won the bid for the BAIHETAN Power Station of Three Gorges Group, CHANGLONGSHAN Power Station of Three Gorges Group, JIANGSU GUOXIN LIYANG Power Station, China HUADIAN SHANGTONGBA Power Station, HUBEI JIANGPINGHE Power Station, Myanmar German Railway Power Station, ZHEJIANG CHANGLONGSHAN Pumped Storage Power Station, XINJIANG XIATE Hydropower Station and, other key projects.
Product information
Grade | Size(mm*mm*mm) | Standard |
N610CF, N800CF | 10-130*1500-4700*L | Q/320116 NJGT 223 Or Technical agreement |
07MnMoVR | 10-60*1500-4700*L | GB/T 19189 |
P460QL1, P690QL1 | 10-100*1500-4700*L | EN 10028-6 |